NUSTAR Technical Design Reports
The following Technical Design Reports describe the equipment to be used at FAIR for the NUSTAR Collaboration and its experiments.
ACTAF
Technical Report for the Design, Construction and Commissioning of the Active Target for FAIR (ACTAF) for the R3B experiment
AIDA
Technical Report for the Design, Construction and Commissioning of the Advanced Implantation Detector Array (AIDA)
BELEN
Technical Design Report for the Beta-Delayed Neutron Detector (BELEN)
CALIFA Barrel
Technical Report for the Design, Construction and Commissioning of The CALIFA Barrel: The R3B CALorimeter for In Flight detection of γ rays and high energy charged pArticles
CALIFA Endcap
Technical Report for the Design, Construction and Commissioning of The CALIFA Endcap
CSC - Cryogenic Stopping Cell
Technical Report for the Design, Construction and Commissioning of the Cryogenic Stopping Cell of the Super-FRS
DEGAS
Technical Report for the Design, Construction and Commissioning of the DESPEC Germanium Array Spectrometer (DEGAS)
DTAS
Technical Report for the Design, Construction and Commissioning of the DESPEC Beta Decay Total Absorption Gamma-Ray Spectrometer (DTAS)
EXPERT
Technical Report for the Design, Construction and Commissioning of the setup EXPERT: Exotic Particle Emission and Radioactivity by Tracking for the Super-FRS Experiment
FATIMA
Technical Report for the Design, Construction and Commissioning of the Fast Timing Array (FATIMA)
GLAD
Technical Report for the Design, Construction and Commissioning of the Large Acceptance Dipole Magnet (GLAD)
Heavy Ion Detector
Technical Report for the Design, Construction and Commissioning of the Heavy Ion Detector of ILIMA
HISPEC/DESPEC Infrastructure
Technical Report for the Design, Construction and Commissioning of the HISPEC/DESPEC Beam Line, Infrastructure and Tracking Detectors
LEB infrastructure
Technical Design Report for the General Infrastructure for the Low-Energy Branch building at FAIR
LYCCA
Technical Report for the Design, Construction and Commissioning of LYCCA
MATS and LaSpec
Technical Report for the Design, Construction and Commissioning of the MATS and LaSpec experimental setups.
MONSTER
Technical Report for the Design, Construction and Commissioning of the DESPEC Modular Neutron time of flight Spectrometer (MONSTER)
NEDA
Technical Design Report for NEDA@HISPEC
NeuLAND
Technical Report for the Design, Construction and Commissioning of NeuLAND: The High-Resolution Neutron Time-of-Flight Spectrometer for R3B
NUSTAR DAQ
Technical Report for the Design of the NUSTAR Data Acquisition System
Plunger
Technical Report for the Design, Construction and Commissioning of the HISPEC Plunger Device
R3B infrastructure
Technical Design Report for the General Infrastructure for the experimental setup of the R3B-Collaboration at FAIR
R3B Target Recoil Tracker (TRT)
Technical Report for the Design, Construction and Commissioning of the Pixel-based Target Recoil Tracker (TRT) for R3B
R3B Tracking Detectors
Technical Report for the Design, Construction and Commissioning of the Tracking Detectors for R3B
R3B Tracking Detectors - Addendum - PAS (Proton Arm Spectrometer)
Addendum to the Technical Report for the Design, Construction and Commissioning of the Tracking Detectors for R3B - the Proton Arm Spectrometer (PAS)
R3B vacuum infrastructure
Technical Design Report for vacuum components for the general experimental setup of the R3B-Collaboration at FAIR
Schottky Detector
Technical Report for the Design, Construction and Commissioning of the Schottky Detector System of ILIMA
Super-FRS
Technical Report for the Design, Construction and Commissioning of the Super-FRS
(restricted access)
Super-FRS Experiment infrastructure
Technical Report for the Design, Construction and Commissioning of the Infrastructure, DAQ and Ancillary systems of the Super-FRS Experiment Collaboration
TOF Detector
Technical Report for the Design, Construction and Commissioning of the Dual TOF-Detector System of ILIMA